Skip to content

Au Projects

Select a project for full description and photos.

Partial refinery and turn-key fire assay laboratory for refining gold from Centerra’s Kumtor deposit.

The only gold deposit in Ukraine with proven gold reserves.

Intertech supplied components of the gold refining process, a fire assay laboratory, and all laboratory instrumentation.

Turn-key gold refinery designed to produce 30 tons per year of 999.9 purity gold.

Large industrial facility processing local ore. Involves a wide range of technologies including intensive gravity, cyanide, autoclave leaching, etc.

Turn-key, self-contained intensive gravity pilot plant for testing ores from different deposits in the region.

We take particular pride in the statistics showing that over 80% of all precious metals produced in CIS (Pt, Pd, Au, Ag) are certified for the sale to foreign exchanges (LME, Zurich) in the laboratories supplied by Intertech.

Partial refinery and turn-key fire assay laboratory for refining gold from Centerra’s Kumtor deposit.

The only gold deposit in Ukraine with proven gold reserves.

Intertech supplied components of the gold refining process, a fire assay laboratory, and all laboratory instrumentation.

Turn-key gold refinery designed to produce 30 tons per year of 999.9 purity gold.

Large industrial facility processing local ore. Involves a wide range of technologies including intensive gravity, cyanide, autoclave leaching, etc.

We take particular pride in the statistics showing that over 80% of all precious metals produced in CIS (Pt, Pd, Au, Ag) are certified for the sale to foreign exchanges (LME, Zurich) in the laboratories supplied by Intertech.

We take particular pride in the statistics showing that over 80% of all precious metals produced in CIS (Pt, Pd, Au, Ag) are certified for the sale to foreign exchanges (LME, Zurich) in the laboratories supplied by Intertech.